PPC-1 Progress

Login



Forgot your password? Create an account

Hits

Content View Hits : 912778
PPC-1 Progress
  Item Qty System Status
Cable Station - Sydney    
90% Complete
  Citec Air Conditioning (Co-Lo) 4
Environmental System
  Citec Air Conditioning (UPS & Switch room) 4 Environmental System
  Citec Air Conditioning (SLTE Room) 3
Environmental System
  Air Conditioning Piping NA Environmental System
  Air Conditioning Condensers (Roof Mount) 26 Environmental System
  Architectural design works NA General Infrastructure
  Building structural works NA General Infrastructure
  Co-Lo raised floor and ramp installation NA General Infrastructure
  Overhead Fibre & Data tray installation NA General Infrastructure
  Office fitout NA General Infrastructure
  Mains to Generator to Mains Switchboard 1 Power Redundancy System
  Generator installation (750kVA Gensets) 2 Power Redundancy System
  Diesel tank installation (21,000l) 1 Power Redundancy System
  Pad-mount transformer installation 2 Power Systems
  UPS Input/Output Switchboards 2 Power Systems
  Main Switchboard installation 1 Power Systems
  Auxiliary co-lo & SLTE switchboards 18 Power Systems
  General Electrical fitout NA Power Systems
  MGE 200kVA UPS Installation 4 Power Systems
  UPS Battery Installation 272 Power Systems
  Test and Commission Power Systems NA Power Systems
  Security & Alarm system installation NA Security System
  DC Rectifiers & Batteries installation 4 Submarine Cable System
  DC Battery Installation 48 Submarine Cable System
  SLTE equipment installation NA Submarine Cable System
  PFE equipment installation NA Submarine Cable System
  LME equipment installation NA Submarine Cable System
  Submarine equipment test & commission NA Submarine Cable System
  Submarine land cable installation NA Submarine Cable System
  Submarine land cable test & commission NA Submarine Cable System
  Type A Training NA Submarine Cable System
  Type B1 Training NA Submarine Cable System
  Type B2 Training NA Submarine Cable System
  Type B3/NOC Training NA Submarine Cable System
HDD - Sydney    
  Site setup    
  Seaward drilling operations    
  Beach manhole construction    
  Landward duct construction    
Terrestrial Fibre    
  Primary fibre civil construction    
  Primary fibre hauling    
  Primary fibre splice    
  Diverse fibre civil construction    
  Diverse fibre hauling    
  Diverse fibre splice    
Cable Station - Guam    
  Electrical works   Power System
  DC battery commission & test   Power System
  UPS battery commission & test   Power System
  Cage construction   General Infrastructure
  Co-lo equipment installation   General Infrastructure
  Co-lo commissioning & testing   General Infrastructure
  SLTE equipment installation   Submarine Cable System
  PFE equipment installation   Submarine Cable System
  LME equipment installation   Submarine Cable System
  Submarine equipment commission & testing   Submarine Cable System
  Submarine land cable installation   Submarine Cable System
  Submarine land cable test & commission   Submarine Cable System
  Type B1 training   Submarine Cable System
  Type B2 training   Submarine Cable System
Permitting - Australia    
  Carrier Licence    
  Non-Protection Zone permit    
  Protection Zone permit    
  Occupation of Crown Lands    
Permitting - Guam    
  FCC Operator licence    
  Dept Army Corps Permit    
  Federal Consistency Permit    
Permitting - Survey Ops    
  Guam Authority Notifications    
  Australian Authority Notifications    
Survey Ops    
  Guam inshore survey    
  Fitout, test & calibrate deep sea survey vessel    
  Deep sea vessel transit to Guam    
  Deep sea survey    
  Australia inshore survey    
  Preliminary survey report    
  Final survey report    
Submarine Cable Manufacuture    
  Repeater start    
  Repeaters 25% complete    
  Repeaters 50% complete    
  Repeaters 75% complete    
  Repeaters 100% complete    
  Repeater testing    
  Branching Unit start    
  Branching Units 100% complete    
  Branching Unit testing    
  Lightweight cable start    
  Lightweight cable 25% complete    
  Lightweight cable 50% complete    
  Lightweight cable 75% complete    
  Lightweight cable 100% complete    
  SPA cable start    
  SPA50% complete    
  SPA 100% complete    
  Armoured cable start    
  Armoured cable 25% complete    
  Armoured cable 50% complete    
  Armoured cable 75% complete    
  Armoured cable 100% complete    
  Land cable construction    
  Cable integration & test (load 1)    
  Cable integration & test (load 2)    
Submarine Cable Laying    
  Load 1 cable loading    
  Load 1 lay (Sydney to PNG)    
  Load 2 cable loading    
  Load 2 lay (Guam to PNG)    
  Total System Commissioning    

 

  Key Description
Complete Progress is complete
In Progress Currently in progress
Approved Item has been approved
Ordered Item has been ordered
Pending Waiting for commencement order
Paused Waiting for confirmation
 
© Pipe International 2008